PMINDIA
The Union Cabinet chaired by the Prime Minister Shri Narendra Modi has approved a Scheme for Promotion of Surface Coal/Lignite Gasification Projects with a financial outlay of Rs.37,500 crore.
The Scheme marks a major step towards accelerating India’s coal/lignite gasification programme, advancing the national target of gasifying 100 Million Tonnes (MT) of coal by 2030, strengthening energy security, and reducing dependence on imports of key products such as LNG (more than 50% imported), urea (~20% imported), ammonia (~100% imported), and methanol (~80–90% imported).
In a significant accompanying reform, the Government has also extended coal linkage tenure up to 30 years under the “Production of Syngas leading to Coal Gasification” sub-sector in the Non-Regulated Sector (NRS) linkage auction framework, providing long-term policy certainty for investment in coal gasification projects.
Background:
India holds one of the world’s largest coal reserves (~401 billion tonnes) and lignite reserves (~47 billion tonnes). Coal accounts for over 55% of the country’s energy mix. Gasification converts coal/lignite into ‘synthesis gas’ (syngas), a versatile feedstock for producing fuels and chemicals domestically, enabling India to substitute high-value imports and insulate itself from global supply disruptions and price volatility.
India’s import bill for key substitutable products LNG, urea, ammonium nitrate, ammonia, coking coal, methanol, DME and others stood at approximately Rs.2.77 lakh crore in FY2025, a vulnerability further exposed by the ongoing geopolitical situation in West Asia.
Building on the National Coal Gasification Mission (2021) and a Rs.8,500 crore scheme approved in January 2024 (under which 8 projects worth Rs.6,233 crore are under implementation), the new Scheme builds on this momentum with significantly enhanced support.